Aged Care

On Luck Chinese Nursing Home Extension (Second Iteration)

 

The existing 60 bed facility on this site was designed by John Henry. John Henry Architects have been engaged to provide a master plan for a 120 bed expansion of the existing facility. See also the first iteration and third iteration.



Follow JHarchitects on Twitter